Skip to content

Seven consulting systems

See how the system moves.

LearnEX combines enterprise transformation, technical quality methods and implementation coaching around the operating problem your organization needs to solve.

Seven-step implementation

Leadership intent becomes an enterprise operating system.

TQM // ENTERPRISE DEPLOYMENTTQM CELL01AWARENESS02ROADMAP03DIAGNOSIS04PRACTICES05COACHING06BENCHMARK07DEMINGSENIOR MANAGEMENT AWARENESS TRAINING ON TQMSMALL q → BIG Q

01 · Enterprise transformation

Total Quality Management

Build an organization-wide system for excellence, not a collection of isolated initiatives.

Distinct systems

Six more methods. Six different visual stories.

02

Breakthrough improvement

Six Sigma & Structured Problem Solving

Turn high-impact business problems into coached, verified improvement projects.

Project-to-benefit pipeline

SIX SIGMA // PROJECT TO VERIFIED BENEFIT01 SELECT02 BELTS03 DMAIC04 GYR REVIEW05 BENEFIT06 RECOGNIZEYELLOWGREENBLACKDMAICCYCLECHRONIC PROBLEMS ALIGNED TO COMPANY GOALS ARE SELECTED AND VALIDATEDBREAKTHROUGH IS TYPICALLY 10X — UNDER 50% DOES NOT QUALIFY
03

Design quality upstream

Quality Management in New Product Development

Make product risk visible while design decisions can still change it.

Design-to-launch traceability

NPD QUALITY // DESIGN STRUCTURE TREE01PRODUCTSTRUCTURE02BOUNDARY03FUNCTIONS04INTERFACES05DESIGNMATRIX06DFMEA07OPTIMIZEDVP&R08LAUNCHEVERY DESIGN DECISION LEAVES AN EVIDENCE TRAILALIGNED WITH THE AIAG & VDA HANDBOOK
04

Failure prevention

Proactive Quality Engineering

Trace how failure can happen, then engineer prevention before defects escape.

Separate the failure chain

PROACTIVE QUALITY // FAILURE INTERCEPTIONPROCESS01 FAILURE MODESPTDB · PFD · DRAWING02 CAUSES16 ERROR TYPES · ISHIKAWA03 SEPARATE RISKFM AND CAUSE RANKED APART04 NEW CONTROLS13 HEP PRINCIPLES05 PROACTIVE ACTIONCAUSE ANALYSIS · WHY-WHYCUSTOMERESCAPING: 15ALL DEFECTS ARE RISK — ACT ON RISK, NOT ON THE DEFECT
05

Operational discipline

Standardization & Improvement

Transfer the best-known way of working, then improve it through daily control.

Five-part capability loop

STANDARDIZATION // CAPABILITY TRANSFER LOOPTHE STANDARD01JOB INSTRUCTION02JOB METHODS03DEXTERITY04DAILY MGMT05PROCESS AUDITWORLD-CLASS SOP AND THE 4-STEP TRAINING APPROACH (TWI)
06

Implementation-led recovery

Turnaround Management

Put joint full-time resources and a weekly performance rhythm behind a ten-month turnaround target.

Ten-month performance system

TURNAROUND // TEN-MONTH PERFORMANCE ENGINE10-MONTH TARGETW01W08W16W24W40SIOPLEANTQMSTAT01 PLANT BASELINE02 JOINT RESOURCES03 FOCUSED METHODS04 WEEKLY KPI05 10-MONTH TARGETCONSTRAINTS AND KPIs MADE VISIBLE
07

Capability by design

Customized Training & Consulting

Diagnose the challenge first, then assemble the right capability modules around it.

Challenge-led configuration

CUSTOMIZED // CHALLENGE-LED CONFIGURATIONCATALOGUECONFIGURED JOURNEYCHALLENGE DEFINEDONE CONFIGURED JOURNEYSENIOR MANAGEMENTPROBLEM SOLVINGQUALITY + ENGINEERINGAUDIT + OPERATIONSGD&T · CORE TOOLSIATF · VDA 6.3THE CHALLENGEAUDIENCE, PERFORMANCE NEED AND CONTEXT DEFINED FIRST

Consulting → Digital handoff

When the method needs a digital operating layer.

Digitization remains in LearnEX Digital. Consulting defines the system; digital products can make selected workflows visible, repeatable and scalable.

Explore Digital

Start with the constraint

Design the right intervention around the real operating problem.

Contact Us